Research paper, The Crucible series

How India Makes Its Power

An industry primer on how India generates its electricity, what the business is worth, and why the mix is changing

September 2026 5 min read Full paper, 29 pages
Cover of How India Makes Its Power

Summary

India has built the third largest power system in the world, from about 1,362 megawatts at Independence to about 548,858 megawatts in June 2026. More than half of that capacity is now clean. Coal still makes about two thirds of the electricity.

This paper treats power generation in India as an industry and as a business: how the electricity is made, who uses it, what the activity is worth, and why the mix of sources is changing. It covers generation only. Carrying power across the country and selling it to the final customer are separate businesses.

Six findings

  1. What is built is not what runs.Non-fossil sources make up about 54% of installed capacity, yet coal produced about 68% of the 1,848 billion units generated in 2025-26, and all fossil fuels together about 71%. A megawatt of coal runs day and night; a megawatt of solar runs only while the sun is up.
  2. Solar is the story of the decade.Capacity rose from about 54 gigawatts in 2021-22 to about 162 gigawatts by mid-2026, making India the third largest producer of solar power in the world. It is the cheapest new power India has had, and it stops just as evening demand peaks.
  3. Coal is being slowed, not retired.India mined about 1.08 billion tonnes in 2025-26, and coal output fell that year as solar, wind and a strong monsoon met the growth in demand. More than 30 gigawatts of new coal is still under construction.
  4. Industry, not households, is the largest customer.Industry takes about 41 to 42% of electricity, households roughly a quarter and agriculture about 17%. Peak demand reached a record of about 271 gigawatts in mid-2026.
  5. Demand has decades of room to grow.Each Indian uses about 1,460 units of electricity a year, well under half the world average. Every extra unit has to come from a plant that has not yet been built.
  6. Generation is a large business in its own right.Valued at what generators are paid at the plant gate, it is worth roughly Rs 7.4 to 9.2 lakh crore a year, and official planning envisages about Rs 33 lakh crore of new investment by 2032.
India is making its capacity cleaner much faster than its actual electricity, because a fast-growing economy cannot afford to give up reliable power before it has something equally reliable to put in its place.From the paper’s conclusion

The evidence

The gap between capacity and generation is the most useful idea in Indian power. Read source by source, it shows each fuel doing a different job.

Share of what is built against share of what runs
SourceInstalled capacity, June 2026Share of capacityShare of generation, 2025-26
Coal224 GW41%68%
Solar162 GW30%9%
Wind57 GW10%6%
Large hydro52 GW9%9%
Gas20 GW4%1.4%
Nuclear8.8 GW1.6%3%

Nuclear is the reverse of solar: a small share of capacity that produces a larger share of the power, because reactors run almost continuously. Gas is the idle fleet, because imported gas is too expensive to burn for most of the year. Source: Central Electricity Authority; generation figures provisional.

Four forces explain why the system looks this way. Energy security favoured domestic coal for decades, and sun and wind are domestic too. Cost now favours solar: solar with battery storage has been contracted at about Rs 2.86 a unit, against Rs 5.30 to 6.30 for new coal. Demand growing at more than 7% a year to 2024-25 means adding every kind of plant rather than replacing any. Sustainability has joined them: coal power is about a third of India’s greenhouse gas emissions, and India has committed to net zero by 2070 and to 60% non-fossil capacity by 2035.

The economics of each plant show why cheap and valuable are not the same thing.

What it costs to build, and what the power sells for
SourceBuild cost per MWRecent price per unit
SolarAbout Rs 3.5 croreRs 2.5 alone; about Rs 2.9 with storage
WindAbout Rs 6 croreRs 3.7 to 4.0
New coalRs 12 to 14 croreRs 5.3 to 6.3
NuclearAbout Rs 15 croreAbout Rs 3.8 (existing fleet)
GasRarely built newRs 11 or more at peak

A unit of solar at noon is not the same product as a unit at 9 pm. That is why storage, pumped hydro and round-the-clock contracts that bundle sources are growing fast from a small base. Indicative figures from recent project disclosures, published benchmarks and SECI auction results.

Most power is sold under power purchase agreements of 20 to 25 years, which turn an expensive asset into predictable income that lenders will finance. A smaller merchant share sells on the power exchanges at market prices. Government-owned and private generators compete side by side: NTPC is by far the largest, and Tata Power, Adani Power, JSW Energy and Adani Green lead the private side.

Where the system is heading

The Central Electricity Authority’s National Generation Adequacy Plan, released in March 2026, projects a system of about 1,121 gigawatts by 2035-36. Three things stand out.

  1. Renewables lead the growth.Solar becomes the largest single source at about 509 gigawatts, alongside about 155 gigawatts of wind and a large build-out of batteries and pumped storage.
  2. Coal keeps growing, more slowly.At about 315 gigawatts it would still produce about half the electricity from less than a third of the capacity.
  3. Nuclear returns.The plan carries about 22 gigawatts of nuclear, against 8.8 today. A 2025 law opened the sector to private companies for the first time and set an ambition of 100 gigawatts by 2047, more than eleven times today’s level.

Peak demand on the same plan would reach about 459 gigawatts. Official demand projections in India have tended to run ahead of reality, so the paper reads that figure as a planning ceiling rather than a forecast.

Four questions to ask of any figure

  1. Is it what is built, or what runs?Clean capacity is growing much faster than clean output.
  2. What is the source for?Its value depends on whether it can be relied on at the hour it is needed, not only on its cost.
  3. Who consumes the power?The shape of demand decides what kind of plant the system needs, and at what hour.
  4. How does the announcement compare with what is delivered?Plants take years to build, and targets are often missed.

The full paper covers how the system was built since 1947, each fuel in turn, the landmark plants from Vindhyachal to Khavda, and the sources behind every figure. For how we work with generators, developers and investors on energy leadership, see our sector page.

Read the full 29-page paper

The web edition covers the argument and the headline evidence. The paper adds the full analysis, every exhibit and the references.

Respond to this paper

Agree, disagree or add evidence from your own organisation. A selection of responses is published each month, with permission.

Discuss it with the author

A 45-minute conversation for your leadership team or board on what the findings mean for your organisation.

Shijo Monichan

Business Consultant, Planet Ganges

Shijo Monichan is a Business Consultant at Planet Ganges, working across research, programme design and delivery for clients in India and the Gulf. He writes for The Crucible research series.

Download PDF

Planet Ganges is an executive search, leadership development and talent advisory firm for India and the Gulf, with offices in Bengaluru and Dubai.

Executive Search Services
Leadership Development
Leadership & Talent Advisory